MODEL  WK-C3011 (WK1021)

350 lm Bike Light

350 lm Bike Light for cycling & running, with 350 lm, Magnetic mounting, USB-C charging.

KEY FEATURES
  • Light output: 350 lm
  • Magnetic mounting
  • USB-C charging
  • Clip-On mounting
  • Red warning / emergency mode
Need pricing, branding or MOQ details?
Send this model to the MFOPTO sales team for a B2B quotation.
Request a Quote

Product overview

350 lm Bike Light for cycling & running, with 350 lm, Magnetic mounting, USB-C charging. Equipped with 2×LED + COB light source, up to 350 lm brightness. Multiple modes: single LED, dual LED, LED flash, COB full bright, half bright, steady red light and red flash, perfect for cycling lighting and safety warning. Built-in strong magnet and back clip for easy attachment anywhere. Comes with dedicated bike mounting bracket, easy to install on bicycle handlebar. Suitable for cycling, maintenance and handheld use. Lightweight only 110g with durable ABS material. Built-in 1800 mAh lithium battery provides 3–4 h working time, fully charged via Type-C in 3–4 h, ideal for daily commute and night riding.

SPECIFICATIONS

Technical details

WK-C3011 (WK1021)
Bulb Type
2 × LED + COB
Power Source
1800 mAh Lithium Battery
Product Size
121 × 40 × 25 mm
Product Weight
110 g
Material
ABS
Operation Mode
1 × LED White / 2 × LED White / 2 × LED Flash; COB White: 100% / 50% / Red / Red Flash
Brightness
350 lm
Working Time
3–4 h
Charging Time
3–4 h
Accessory
Type-C + Bike mounting Bracket

Compliance Documents

Compliance requirements vary by market and product configuration. Common documentation may include CE-related conformity documents and RoHS reports for the EU, FCC-related documentation for the US, and applicable battery safety and transport reports. Contact us to confirm document availability for your selected model and destination market.

Request Documents →
APPLICATIONS

Typical use cases

Cycling & Running Roadside Safety & Emergency
B2B SOURCING

Discuss WK-C3011 (WK1021) with MFOPTO

Ask about target quantity, logo customization, packaging, certification and lead time.

Start an RFQ